VELARU MANDATE EXHIBIT PACK — NUCLEAR POWER / CRITICAL INFRASTRUCTURE Jurisdiction: China (cn) Modality: Text / Chat Program: Velaru Nuclear Power / Critical Infrastructure · China (galactic_nuclear_power_cn) Product ID: nuclear_power:cn:bundle:text Vertical: nuclear_power Generated: 2026-08-20T08:53:22.059224Z Authority: China CAC Algorithm Filing Pack — Nuclear AI Safety Decision Pack Deadline: NRC AI guidance + NERC CIP Velaru verify: https://velaru-erra.onrender.com/verify EXHIBIT A — AI INVENTORY [] EXHIBIT B — GOVERNANCE FRAMEWORK { "framework": "Velaru Mandate Registry \u2014 Nuclear Power / Critical Infrastructure", "exhibit_authority": "China CAC Algorithm Filing Pack \u2014 Nuclear AI Safety Decision Pack", "regulatory_frameworks": [ "NRC 10 CFR 50", "NERC CIP", "CAC Generative AI Measures", "PIPL", "DSL", "Algorithm Recommendation Rules" ], "standards_alignment": [ "POSS-2", "DRP-1", "TCB", "FRE 707 pre-compliance", "ISO 42001" ], "human_oversight": "modify safety-related system", "third_party_verification": "https://velaru-erra.onrender.com/verify (operator-independent)", "data_lineage": "Hash-chained Ed25519 receipts; optional RFC3161 + external anchor", "mirror_trap": "Predictive maintenance AI influences outage decisions \u2014 utility owns NRC finding, vendor owns SaaS SLA. \u00b7 Algorithm filing requires decision logic documentation \u2014 independent verify acceptable to CAC review.", "chain_integrity": { "depth": 4, "invariant_holds": true } } EXHIBIT D — DATA INPUTS & VALIDATION { "data_validation_method": "Cryptographic receipt per AI decision; public verify without trusting deployer, vendor, or Velaru operator", "bias_testing_proxy": "Asymmetry score from live chain signals", "model_change_control": "Policy lock registry \u2014 criteria hash frozen pre-dispute", "logging_retention": "90-day pre-dispute window minimum; permanent verify permalinks", "external_validator": "Nisaba LLC / Velaru", "validator_independence": "Client-side Ed25519 verify; BYOK tri-receipt optional", "headline_stat": "10 CFR 50 requires documented safety analysis \u2014 AI recommendation without record = violation", "global_leaders_addressed": [ "NRC", "Exelon", "NERC", "IAEA", "Duke Energy", "CAC", "Tencent", "Alibaba" ] } MIRROR TRAP (regulatory insight) Predictive maintenance AI influences outage decisions — utility owns NRC finding, vendor owns SaaS SLA. · Algorithm filing requires decision logic documentation — independent verify acceptable to CAC review. NERVE CARDS — WHY GLOBAL LEADERS CARE [ { "title": "Safety-related AI", "body": "Any AI touching safety systems requires 10 CFR 50.59 evaluation \u2014 receipt is evaluation record.", "source": "vertical" }, { "title": "NERC CIP", "body": "Cybersecurity of AI accessing BES \u2014 CIP-007 applies to AI agents on OT network.", "source": "vertical" }, { "title": "Insurance uninsurable", "body": "Without external validation, nuclear AI risks become uninsurable \u2014 plant outage cost $1M/day.", "source": "vertical" }, { "title": "[China] Dual compliance", "body": "Multinationals operating CN + US/EU \u2014 one architecture, jurisdiction-tagged receipts.", "source": "jurisdiction" }, { "title": "[China] DeepSeek moment", "body": "Chinese model deployment globally \u2014 provenance receipt links model to decision.", "source": "jurisdiction" }, { "title": "[Text / Chat] Modality hook", "body": "Baseline \u2014 all frameworks apply to text decisions.", "source": "modality" } ] BOOK SUMMARY: { "total_insureds": 0, "compliant": 0, "grace_period": 0, "non_compliant": 0, "expired": 0, "not_enrolled": 0, "compliant_pct": 0.0 } TAM / EXPOSURE: US nuclear fleet · NRC increasing AI scrutiny post-2024 guidance INSURANCE LINES: Nuclear property, Utility liability DISCLAIMER: External validation evidence pack — not legal advice, not filed rate approval.